- University of Colorado Boulder Climate Action Plan
- University of Oregon Erb Memorial Union (EMU)
- University of Washington, Tacoma Paper & Stationery Building
- University of Oregon Unthank Hall
- Santa Monica - Malibu Unified School District Malibu High School Restart
- Loyola Marymount University Freshmen & Upper Division Student Housing
- Tigard-Tualatin School District Tigard High School Modernization
- Mirabella at Arizona State University
- Sonoma State University Carbon Neutrality Roadmap
- University of California San Francisco Hematology, Blood, and Marrow Transplant Clinic
- California State University Long Beach Parkside North Housing
- George Mason University Energy Efficiency & Resiliency Action Plan
- Tigard-Tualatin School District Tualatin High School Renovation and Addition
- California State University East Bay Strategic Energy & Carbon Neutrality Plan
- AVCCD Antelope Valley College Discovery Lab
- San Diego State University Carbon Neutrality Plan
- University of California, Los Angeles Southwest Campus Apartments and Lot 15 Residence Hall
- University of California, San Diego North Torrey Pines Living and Learning Neighborhood
- University of California, Riverside Student Success Center
- University of Washington Haring Center for Inclusive Education
- University of California Santa Barbara, San Benito Student Housing
- CSU Long Beach Parkside North Housing Administration Building
- California University Polytechnic San Luis Obispo - Housing Future Plan
- Tigard-Tualatin School District Art Rutkin Elementary School
- University of Washington, Seattle School of Medicine 3.2
- San Diego State University Engineering & Interdisciplinary Sciences Building
- San Diego State University Huāxyacac Hall
- CSU Long Beach Clean Energy Master Plan
- Chapman University Keck Center for Science and Engineering
- Santa Barbara City College West Campus Center
- California State University Northridge Student Housing Phase 2
- California State University Stanislaus Student Union
- University of Oregon Jane Sanders Softball Stadium
- Harvey Mudd College Drinkward Hall Student Housing
- University of Texas Football Players Facility
- University of Washington Bothell - Discovery Hall
- UCLA Hitch Suites and Commons Buildings
- Matthew Knight Arena - University of Oregon
- Mission College Student Engagement Center
- Creekside Community High School
- University of Washington, Tacoma - Russell T. Joy Building
- Pacific Northwest College of Art
- University of Oregon - Straub Hall
- California State University Northridge Sustainability Center
- University of Washington, Denny Hall
California University Polytechnic San Luis Obispo – Housing Future Plan
San Luis Obispo, California, United States
Glumac is providing mechanical, electrical, plumbing lighting, high-level energy consultation, and technology integration for California State Polytechnic University – San Luis Obispo’s Housing Future Plan. This is a ten-year master planning effort with various phases including site enabling, or make-ready, design of underground dry utilities, new construction on nine new student residence halls, and renovation of six existing residence halls.
The design and construction include approximately 5,800- beds, nine (9) new student housing projects at the current
North Mountain and K-1 parking sites, and renovation of six (6) existing residential halls at the current South Mountain site. This is a design-build effort – Glumac has continuously worked to improve design with both our design and contracting partners.
The Housing Future Plan Red Bricks included mechanical, electrical, and plumbing design – services are mechanical, plumbing, electrical, communications and energy. Site enabling included medium voltage and communication design for main campus distribution network to new and renovated housing, it also included street lighting design.
The new construction included exterior lighting design for the site pathway or pedestrian lighting.
At this time Glumac has concluded the project definition phase, which was a submission of the Housing Future Plan project narrative, inclusive of all phases, and estimated costs to the California State University (CSU) Capital Planning Design & Construction (CPDC) and the CSU Board of Trustees (BOT).
Construction Cost: $1.22 Billion, for all phases
Start/End Date: January 2024 – June 2030
Architect: Steinberg Hart
Contractor: Whiting Turner
Owner: California State Polytechnic University – San Luis Obispo
Services: Mechanical, Electrical, Plumbing, Lighting, Energy, and Technology Integration