- Academy of Motion Pictures Arts and Sciences Museum of Motion Pictures
- SR 520 Montlake
- Meyer Memorial Trust
- Delta Sky Way LAX Terminal 2 & 3 Modernization
- Sound Transit O&M Facility East
- I-64 Corridor Hampton Road Bridge Tunnel Expansion
- Resorts World Las Vegas
- Seattle Asian Art Museum
- Refugee Women’s Alliance
- University of California San Francisco Hematology, Blood, and Marrow Transplant Clinic
- University of California Davis Aggie Square
- Boulder Creek South MOB and Outpatient Surgery
- Kaiser Permanente La Habra Medical Office Building
- Kaiser Permanente Murrieta Mapleton Medical Office Building
- Santa Barbara City College West Campus Center
- Chapman University Keck Center for Science and Engineering
- National Oceanic and Atmospheric Administration
- Banc of California Stadium
- Newport Beach Civic Center
- MGM CityCenter
- Edith Green-Wendell Wyatt Federal Building
- Matthew Knight Arena - University of Oregon
- Amazon HQ - Vulcan Blocks 44, 45, 52e
- Levi's Stadium
- Pacific Northwest College of Art
University of California San Francisco Hematology, Blood, and Marrow Transplant Clinic
San Francisco, California, United States
Glumac is providing commissioning services for the University of California San Francisco Ambulatory Care Center Blood Marrow Transplant Expansion project. The goal is to expand the Hematology and Blood and Marrow Transplant Outpatient Clinic at the Parnassus Heights campus site. The project includes the demolition and renovation of a portion of the 3rd and 4th floors in an existing multistory building.
The 3rd floor will accommodate new exam rooms, reception areas, patient restrooms, and back of house service areas. The space includes new mechanical, electrical, plumbing, and controls systems with no changes to the base building systems.
Thanks to the architectural design, the use of active chilled beams in the clinic was made possible, as the space does not experience big temperature fluctuations. Significant coordination was needed to connect into UCSF’s network, and Glumac is working closely with both UCSF and the controls contractor to verify accurate communication that allows both parties to work effectively. Glumac additionally coordinated with general contractor and their team, keeping the project on track and moving forward.
Commissioned
- Cooling Coils
- Active Chilled Beams
- Variable Volume Reheat Air Terminal Devices
- HVAC Controls
- Electric Water Cooler
- Domestic Hot Water Systems
- Lighting and Lighting Control Systems
Size: 16,500 sf
Construction Cost: $13,000,000
Start/End Date: March 2023 / July 2024
Delivery Method: Design Bid-Build
Arichtect: Taylor Design
Contractor: Dome Construction
Owner: University of California San Francisco, Health
Services: Commissioning