- citizenM Downtown Los Angeles
- Oro Fino - Moda Center
- Limelight Hotel Ketchum
- Resorts World Las Vegas
- Armenian American Museum and Cultural Center
- citizenM South Lake Union
- citizenM San Francisco
- Westin Anaheim Resort
- One Beverly Hills
- War Memorial Veterans Building
- Domaine Serene Winery
- Providence Park
- CenturyLink Field Tune Up
- SoFi Stadium
- Wilshire Grand Tower
- Banc of California Stadium
- University of Oregon Jane Sanders Softball Stadium
- Newport Beach Civic Center
- Oregon Convention Center
- Silverrock Resort Luxury & Lifestyle Hotels
- MGM CityCenter
- University of Texas Football Players Facility
- The Ranch - Extron
- Sokol Blosser Winery Tasting Room
- Matthew Knight Arena - University of Oregon
- Gerding Theatre at the Armory
- Levi's Stadium
- Allison Inn & Spa
- Indian Wells Tennis Garden
citizenM South Lake Union
Seattle, Washington, United States
Glumac’s presence in Seattle’s South Lake Union neighborhood continues to grow with this seven-story, 264-unit boutique hotel. It boasts a bar, gym, exterior mural, computer area, and chic lobby.
It came together through modular construction, where an off-site team in Europe assembled 228 individual modules, which the local project team later assembled on-site. Modular construction typically has a lower carbon footprint due to reduced materials waste and greater efficiency in transporting the materials.
Glumac provided mechanical, electrical, and plumbing design-assist narratives and construction administration support. Notable systems include a four pipe system, a dedicated outside air system with energy recovery, and induction units.
Glumac also provided LEED commissioning on the hotel. One particular value-add was the commissioning agents’ coordination with the European controls contractor to executive effective testing. The commissioning team had to clarify discrepancies in the European systems (versus the more familiar U.S. systems), while working within the time difference. Once clarifications were in place, the commissioning agents had to relay the information to the on-site controls contractor.
Awards/Certifications
LEED Gold
Size: 82,000 square feet
Start/End Date: July 2017 / December 2020
Delivery Method: Design-Build
Architect: Gensler
Contractor: Mortenson
Owner: citizenM
Services: MEP Engineering, Commissioning